beautypg.com

Chp 6 interfacility link cables, Interfacility link cables – Comtech EF Data MIDAS Site Survey Report User Manual

Page 45

background image

Site Survey Report, Operator’s Guide, Rev.1

Interfacility Link Cables 6-1

6666

66666666

....

........

IIII

IIIIIIII

nnnn

nnnnnnnn

tttt

tttttttt

eeee

eeeeeeee

rrrr

rrrrrrrr

ffff

ffffffff

aaaa

aaaaaaaa

cccc

cccccccc

iiii

iiiiiiii

llll

llllllll

iiii

iiiiiiii

tttt

tttttttt

yyyy

yyyyyyyy

LLLL

LLLLLLLL

iiii

iiiiiiii

nnnn

nnnnnnnn

kkkk

kkkkkkkk

C

C

C

C

C

C

C

C

C

C

C

C

aaaa

aaaaaaaa

bbbb

bbbbbbbb

llll

llllllll

eeee

eeeeeeee

ssss

ssssssss

I

I

n

n

t

t

e

e

r

r

f

f

a

a

c

c

i

i

l

l

i

i

t

t

y

y

L

L

i

i

n

n

k

k

C

C

a

a

b

b

l

l

e

e

s

s

Provide a sketch of the IFL cable run from Antenna pad to indoor equipment
including the following dimensions.

Approximate length of interface cable route segments:

Antenna to bldg. entrance: Feet

Meters

Bldg. entrance to indoor equipment rack: _______Feet

Meters

Total length:

Feet

Meters

Number of floors cable must traverse vertically:

1. Will conduit be required from the point of indoor entry to the equipment

rack: Yes ____ No ____

Other:

_____________________________________________________________

Is there an existing cable conduit from antenna site to the building?

No ____ Yes____

If Yes, check conduit routing and provide following information:

Purpose of existing conduit(s): _______________________

No. of conduits: _________

Note: 2-grounded conduits are recommended for the exclusive use of earth station
power and signal cables.