beautypg.com

Cb 5 series – Code Blue CB 5-S ECONOMICAL SLIM HELP POINT User Manual

Page 21

background image

Code Blue

259 Hedcor Street

Holland, MI 49423 USA

800.205.7186

www.codeblue.com

GU-158-D

page 21 of 42

CB 5 Series

Administrator Guide

14 CB 5 Series Tower Base Gasket Installation Instructions

1.0 FOUNDATION (see anchor bolt installation instructions)

2.0 SET THE UNIT

2.1 Screw one set of nuts and washers onto the anchor bolts. After the foundation

has set, screw one set of nuts, followed by one set of washers, onto the anchor

bolts. Set the nuts so the lowest washer is about 2½ inches above the concrete

at an even height.

To accomplish this, use a small level and check from front to back, side to side

and diagonally. These nuts are NOT adjustable after the unit is in place.


The bottom edge of the Code Blue unit will be ½-inch above the concrete when

installed.

2.2 Set the Code Blue unit on the anchor bolts. Align the phone plate in the

desired direction and lift the Code Blue unit over the anchor bolts. Note that the unit weighs

approximately 180-230 pounds and that the 5 Series does not contain a bracket on the inside of

the unit. Use appropriate lifting materials and methods to avoid possible injury and/or damage.

IMPORTANT: Leveling the bottom nuts is
crucial to leveling the unit. A small error will be
magnified after installation.

IMPORTANT: A ½-inch minimum air gap is
required between the foundation and the unit to
prevent moisture problems.