6 ..... setup – BUG-O Systems SE-2PTD User Manual
Page 6

6
The machine is designed to be fixed to a worktable. The machine needs to be bolted to the table
through the mounting holes located in the legs of the machine. The machine is to be operated
from a separate power line; it can be supplied for voltage ratings of 120 or 240 VAC. Verify which
model you have prior to applying power. The torch arm should already be inserted into the linear
drive located on the top of the machine. If it is not, throw the power switch to the “on” position, and
carefully insert the torch arm into the v-wheels located inside of the linear drive from the chuck end.
Slide the torch arm in until the teeth touch the drive gear. Then, using the manual jog switch, drive
the arm back into the machine. Push the reset button so the machine holds its position. Insert the
cutting torch into the torch holder and position the torch so that is centered in line with the chuck axis.
The machine can be used with oxy-fuel or plasma torches. If the machine is set-up for oxy-fuel
cutting, use a three-hose cutting torch and run the hoses to the quick action manifold with solenoid.
The solenoid controls the cutting oxygen. If the machine is set-up for plasma cutting, it will be
equipped with a rotary ground, contact relay, and holding clamp for a plasma torch. Plug the contact
relay into the contact output located on the control panel. Wire the trigger leads for the plasma
machine to the supplied connector and plug into the contact relay box.
SETUP
Loop the gas hose or plasma cable
over the cable hanger located on the
top of the machine for support. Plug
the programming pendant cable into the
pendant control connection located on
the control panel. Place the programming
pendant in the pendant holster located to
the right of the control panel.
The adjustable pipe support (A) is attached
to the rear of the machine, is used with
long pipes, to help keep the pipe (B)
aligned. Make sure to adjust the height
of the rollers (C) so that the pipe runs true
when rotating. The machine is now ready
to be programmed for operation.
A
C
B
Pipe Support Rear View