beautypg.com

Bronkhorst IN-FLOW User Manual

Page 5

background image

BRONKHORST HIGH-TECH B.V.

BUS/digital operation

For this procedure: See description for specific fieldbus

Send a setpoint to the instrument and check the

measured value

Let the instrument warm-up for 30 minutes for best

accuracy

Your Mass Flow/Pressure Meter/Controller is now

ready for operation.

! Caution

Operation via fieldbus is done by means of a flatconductor

cable connected with the main PC board.

Although all functionality is possible by means of RS232

and the switch on top of the instrument, it is important

that care should be taken when removing the upper part

of the housing.