Safety instructions

Only switch the PC off after
closing the software

Before the Industrial PC is switched off, software that is running must
be properly closed.

Otherwise it is possible that data on the hard disk is lost. Please read the
section on “Switching off”.

Switch off all parts of the
equipment, then uncouple
the field bus

Before opening the housing of the PC, and whenever the PC is being
used for purposes other than plant control, such as during functional
tests following repair, all parts of the equipment must first be
switched off, after which the Industrial PC can be uncoupled from the
plant.

Pulling out the field bus connection plug uncouples the PC.

Items of equipment that have been switched off must be secured
against being switched on again.

Do not open the power
supply unit while voltage is
applied

The Industrial PC’s power supply unit must be supplied with
230 V / 115 V AC.

The supply voltage must be switched off before the power supply unit
housing is opened.

Do not exchange any parts
when under power

When components are being fitted or removed, the supply voltage
must be switched off.

Fitting work on the PC can result in damage:

if metal objects such as screws or tools fall onto operating circuit
boards.
if connecting cables internal to the PC are removed or inserted
during operation.
if plug-in cards are removed or inserted when the PC is switched
on.

The operator’s duties

National regulations
depending on the
machine type

Test regulations

Depending on the type of machine and plant in which the Industrial PC is
being used, there will be national regulations for the control of such
machines and plant that the operator must observe. These regulations
cover, amongst other things, the intervals between inspections of the
controller.

The operator must initiate such inspections in good time.

Only trained personnel may
open the PC’s

The operator is responsible for ensuring that only trained electrical staff
opens the housing of the Industrial PC.

Software knowledge

Every user must be familiar with any of the functions of the software
installed on the PC that he can reach.

Make operating instructions
accessible

The contents of these operating instructions must be known by every user
of the Industrial PC and by every fitter who installs, removes or opens the
device.