background image

Hardened Ethernet Switch

6

LED State

Indication

POWER

Steady

Switch is properly connected to power and
turned on.

PWR1

PWR2
(Green)

Off

Switch is not connected to power and is
turned off.

FAULT

Steady

1. Power failure occurred.
2. Port failure occurred (when port fault alarm

dip switch is enabled).

FAULT
(Red)

Off

1. Power failure is not occurred.
2. Port failure is not occurred (when port fault

alarm dip switch is enabled).

3. Port fault alarm dip switch is disabled.

10/100BaseT/TX

or

100BaseFX

Steady

A valid network connection established.
LNK stands for LINK.

LNK/ACT
(Green)

Flashing

Transmitting or receiving data.
ACT stands for ACTIVITY.

Steady

Light solid yellow for a port transferring at
100Mbps.

100
(Yellow)

Off

The port is transferring at 10Mbps If this LED
is dark.

Assembly, Startup, and Dismantling

y

Assembly: Place the switch on the DIN rail from above

using the slot. Push the front of the switch toward the
mounting surface until it audibly snaps into place.

y

Startup: Connect the supply voltage to start up the

switch via the terminal block.

y

Dismantling: Pull out the lower edge and then remove

the switch from the DIN rail.