beautypg.com

Appendix a: power consumption, A: p, Ppendix – NEXCOM APPC 1240T User Manual

Page 115: Ower, Onsumption, Power consumption management

background image

Copyright © 2015 NEXCOM International Co., Ltd. All Rights Reserved.

99

APPC 1240T/1245T/1540T/1740T/1940T User Manual

Appendix A: Power Consumption

a

PPendIx

a: P

ower

C

onsumPtIon

Power Consumption Management

Purpose

The purpose of the power consumption test is to verify the power dissipation
of the system and the load of the power supply.

Test Equipment

1. PROVA CM-07 AC/DC CLAMP METER
2. Burn-in test ver:6.0

Device Under Test

DUT: sys#1

Test Procedure

1. Power up the DUT, boot into Windows XP.
2. Enter standby mode (HDD power down).
3. Measure the power consumption and record it.
4. Run Burn-in test program and apply 100% full loading.
5. Before and after testing, test the system insulation.

+12V

+24V

+30V

Full-Loading Mode

1.99A

1.04A

0.86A

Total

23.88W

24.96W

25.9W

Standby Mode

0.1A

0.1A

0.1A

Total

1.2W

1.2W

1.2W

APPC 1940T

+12V

+24V

+30V

Full-Loading Mode

2.13A

1.09A

0.91A

Total

25.56W

26.16W

27.3W

Standby Mode

0.1A

0.1A

0.1A

Total

1.2W

1.2W

1.2W

APPC 1740T

This manual is related to the following products: