Appendix a: power consumption, A: p, Ppendix – NEXCOM APPC 1240T User Manual
Page 115: Ower, Onsumption, Power consumption management
Copyright © 2015 NEXCOM International Co., Ltd. All Rights Reserved.
99
APPC 1240T/1245T/1540T/1740T/1940T User Manual
Appendix A: Power Consumption
a
PPendIx
a: P
ower
C
onsumPtIon
Power Consumption Management
Purpose
The purpose of the power consumption test is to verify the power dissipation
of the system and the load of the power supply.
Test Equipment
1. PROVA CM-07 AC/DC CLAMP METER
2. Burn-in test ver:6.0
Device Under Test
DUT: sys#1
Test Procedure
1. Power up the DUT, boot into Windows XP.
2. Enter standby mode (HDD power down).
3. Measure the power consumption and record it.
4. Run Burn-in test program and apply 100% full loading.
5. Before and after testing, test the system insulation.
+12V
+24V
+30V
Full-Loading Mode
1.99A
1.04A
0.86A
Total
23.88W
24.96W
25.9W
Standby Mode
0.1A
0.1A
0.1A
Total
1.2W
1.2W
1.2W
APPC 1940T
+12V
+24V
+30V
Full-Loading Mode
2.13A
1.09A
0.91A
Total
25.56W
26.16W
27.3W
Standby Mode
0.1A
0.1A
0.1A
Total
1.2W
1.2W
1.2W
APPC 1740T