beautypg.com

Fsw-21f-cm series, Functional description, Assembly, startup, and dismantling – Neotech Communications FSW-21F-CM User Manual

Page 2: Standalone units installation, Card module installation

background image

FSW-21F-CM Series

Industrial 2-port 10/100Base-TX to 100Base-FX Switch

V3

2

The 10/100Base-TX

The 10/100Base-TX Connections

The following lists the pinouts of 10/100Base-TX ports.

Pin

Regular Ports

Uplink port

1

Output Transmit Data +

Input Receive Data +

2

Output Transmit Data -

Input Receive Data -

3

Input Receive Data +

Output Transmit Data +

4 NC

NC

5 NC

NC

6

Input Receive Data -

Output Transmit Data -

7 NC

NC

8 NC

NC

The Port Status LEDs, dimension drawing for the Standalone unit

LED State

Indication

PWR

Green Power

on.

Off Power

off.

FX LINK

Green 100Base-FX

SPD1, 2

Green 100Base-TX

Amber 10Base-TX

LINK/ACT

1, 2

Steady

A valid network connection established

Flashing Transmitting

or

receiving data. ACT Stands for

Activity.


Functional Description

 Converts 10/100Base-TX to 100Base-FX
 Full/Half duplex, Auto-Negotiation
 Singlemode or Multimode fiber operation
 Single or Dual-core fiber with SC or ST connectors
 Store and forward switching mechanism
 MDI/MDI-X Auto-Crossover supported
 Plug-and-Play

/

Hot-swappable

 -20 °C to 60 °C (-4 °F to 140 °F) operating temperature
 Wall-mount or operate in NC-R12 rack mount chassis

Assembly, Startup, and Dismantling

Standalone units Installation

 Assembly: Mount the standalone unit onto a fixture, e.g. a plank, (either on the wall or on a flat surface) with at least 2

screws piercing through the holes on the mounting frame to secure it in position.

 Startup: Connect the supply voltage to start up the Media Converter via the terminal block.
 Dismantling: Locate and remove the securing screws. Usually, but not limited to, at least 2 screws.

Card Module Installation

 Assembly: The Card Module can be used as slide-in module to the NC-R12 (12-slot Rack Mount Chassis).
 Startup: Turn on the NC-PSU/5V for the supply voltage to start up the Switches via NC-R12.
 Dismantling: The Card Module can be removed as slide-out module form the NC-R12 (12-slot Rack Mount Chassis).

Manual Earth Green manual is available in our website.

www.neotechcomm.com.tw