Threading procedure (cont’d) – Drylam 27STA Roller Laminator User Manual
Page 14
23220 W. 84
th
St., Shawnee, KS 66227
Phone: (888) 633-1973
Brian Jennett- Tech-Line/Service Manager ext 8575
27STA Instruction manual.docx Page 14 of 24
THREADING PROCEDURE (cont’d)
Remove the feed tray and the heat guard.
Thread the film as shown in the figure on
the right. Pull the film around the idler
rollers as shown. Do not mistake the
reinforcing bar for the idler roller. Make
sure the glossy and dull sides of the film are
as indicated in the diagram. Position the
threading board provided.
Turn power on by pressing the ON/OFF
button. Turn the key switch to on (the
horizontal position).
Start the motor by pressing the "Start"
button, and reduce the speed to 1
foot/min. Push the threading board and
film in between the heat shoes. The
internal rollers will pull the film through
the heat shoes until it comes out between
the rollers at the back of the laminator.
NOTE: Keep fingers away from the rollers
at the rear of the laminator!
Check the film overlap. Slide the top and
bottom film rolls from side to side on
the mandrels so that the film is
perfectly aligned (overlapped) top and
bottom (Note: poor overlap will cause
the film to deposit residue on the heat
shoes and rollers, so this procedure is
critical). Replace feed tray and heat
guard.