Installation and connection – AXING SKP 2-10 User Manual
Page 6

Operation Instructions SKP 2-10
Chapter 2: Installation and connection
6
© AXING AG • Swizzerland • Reserving change in design and type
31.05.12
2
Installation and connection
The SKP 2-10 can either be operated in a headend basic unit SKS x-xx or in stand alone mode. SAT ZF
signals of the LNB(s) are either transmitted through a multiswitch or directly to SAT ZF inputs.
The maximum admissible current per SAT-ZT input is 250 mA.
2.1
Installation and connection in a headend base unit
If the SKP 2-10 should operate in a headend basic unit SKS x-xx, the twin module is plugged in the
output collection field c and fastened with screws. Each free slot may be used. The power supply of the
module is provided by the output collection field.
For detailed information on the headend base unit, refer to whose operating instructions.
Before inserting or changing a module, pull the mains plug of the headends basic unit from the socket!
Ground the base plate in order to avoid dangerous overvoltages according to EN 50083-1, EN 60728-
11:2010 (attention: risk of fire/death).
Important
Fig. 3: Installation and
connection in a headend
base unit
Notes