beautypg.com

Nstallation, Heck – Dansons Group HCF300 User Manual

Page 9

background image

Copyright 2004

9

Cheap Charlie

Owner’s Manual

Canadian Comfort Industries

www.dansons.com

Dansons Group Inc.

Window

Burn Pot

Burn Grate

Heat Tubes

Tube Scraper

Ash Pit

Hopper

Fan Motors

Auger

Exhaust

Air Intake

Auger Motor

Base

Hopper Lid

I

NSTALLATION

C

HECK

L

IST


Unless you are knowledgeable and experienced in stove installation, we recommend your

Cheap Charlie

heater

receive a Pre-delivery Check and be installed by an Authorized

Cheap Charlie

Dealer.

COMPLETE THIS CHECK LIST PRIOR TO LIGHTING YOUR FIRST FIRE:


_____ Carefully read this "Owner's manual”. SAVE THIS MANUAL.

_____ Obtain final inspection and approval by local building officials.

_____ Carefully clean all marks off the brass parts before the first fire is lit. Use a soft cloth and a "Windex"

type cleaner. Caution: Never use an abrasive cleaner on any part of your stove.

_____ Polish the hopper to remove the oil type coating used in manufacturing.

_____ Have your Authorized

Cheap Charlie

Dealer demonstrate all the operational, cleaning and

maintenance steps necessary for your stove.

_____ Sign and keep a copy of the Pre-delivery Check List supplied by your Authorized Pelpro Dealer,

“Dansons Certified Installer”, found inside our appliance or available online.
Register online at

www.dansons.com/support

for Extended Warranty.

______ Register your purchase online at www.dansons.com/support.

_____ Fill the hopper with quality pellets to prime the unit; Using the CCI “Acu-Tron”, (figure 5), PUSH the

FEED RATE Touch Pad and this will start the auger and the combustion fan.

NOTE: Do not attempt to light a fire at this time. Leave the START / FEED RATE [ON] for 2 to 5 minutes until
pellets start dropping into the burn grate. Then touch the OFF pad to turn off system . The auger is now primed to
deliver fuel to the burn grate (figure 6). Then light the stove according to the directions outlined in "LIGHTING
YOUR STOVE",

CCIAU –“AcuTron Board” Cutaway View

Figure 5

Figure 6

This manual is related to the following products: