ABtUS AV817 User Manual
Page 8
ABtUS
SINGAPORE PTE LTD
www.abtussingapore.com
INSTALLATION
NOTE: Do consult a qualifi ed and authorized service technician if you encounter any technical diffi culties. We are not
liable for any damage or injuries arising from any improper installation or mishandling.
2. Installation of Universal Ceiling Mounting Kit
* Please consult our authorized service person when you meet any
trouble in installation. We are not liable for any damage or injury caused
by mishandling or improper operation.
2.2
Lift and insert the assembled Projector
done in step 2.0 into the lower Rod
of the Universal Ceiling Mounting Kit.
Insert the Locking Hook into the cutting
slot and tighten them with M8x50
Socket and Self-locking nut.
2.1
Install the Ceiling plate to the ceiling by
M8 bolt (not included) into the ceiling.
Refer to diagram
2.3
Installtion completed.
5"