beautypg.com

Installation, Actuator, Disc – Nexen SPC 837400 User Manual

Page 5: Caution

background image

5

FORM NO. L-20095-U-1112

4. To remove the Q.D. bushing, remove the pull-up bolts

and reinsert into the threaded holes in the Q.D. bushing.

Tighten the pull-up bolts to push the disc off the Q.D.

bushing.

ACTUATOR

Note

The Spring Actuator Assembly and the Air Actuator Assembly are sold separately. One or two Actuators can

be installed on the SPC Brake. When one Actuator is used, the brake torque will be higher if the Actuator is

mounted on the High Torque Arm (Item 4). When two Actuators are used on the SPC Brake, both Actuators

must be of the same type.

S

Pring

a

ctuator

1. Insert the Rod (Item 43), Jam Nut (Item 31), and Spacer

(Item 32) into the Actuator (See Figure 2).

Note

Mount this assembly on either the Low Torque Arm

(Item 3) or the High Torque Arm (Item 4) (See Figure

2).

2. Install the Cap Screws (Item 33) and the Lock Washers

(Item 34) (See Figure 2).

3. Tighten the Cap Screws (Item 33) to 64.5 Nm [48

ft-lb] torque.

Figure 2

Low Torque

Arm (Item 3)

Actuator

High Torque

Arm (Item 4)

Rod

(Item 43)

Jam Nut

(Item 31)

Spacer

(Item 32)

Cap Screws

(Item 33)

Lock Washers

(Item 34)

INSTALLATION

Dial

Indicator

Figure 1

R

E

T

E

M

A

I

D

]

s

e

h

c

n

i[

m

m

T

C

U

D

O

R

P

.

O

N

D

Q

G

N

I

H

S

U

B

E

U

Q

R

O

T

]

b

l-

t

f

[

m

N

]

2

1

[

5

0

3

1

0

2

4

3

9

F

S

]

0

3

[

5

.

0

4

]

4

1

[

6

5

3

2

0

2

4

3

9

E

]

0

6

[

1

8

]

6

1

[

6

0

4

3

0

2

4

3

9

E

]

0

6

[

1

8

]

8

1

[

7

5

4

4

0

2

4

3

9

J

]

5

3

1

[

5

.

2

8

1

]

0

2

[

8

0

5

5

0

2

4

3

9

J

]

5

3

1

[

5

.

2

8

1

]

2

2

[

9

5

5

6

0

2

4

3

9

J

]

5

3

1

[

5

.

2

8

1

]

4

2

[

0

1

6

7

0

2

4

3

9

J

]

5

3

1

[

5

.

2

8

1

Table 1 (Non-Ventilated Discs)

R

E

T

E

M

A

I

D

]

s

e

h

c

n

i[

m

m

T

C

U

D

O

R

P

.

O

N

D

Q

G

N

I

H

S

U

B

E

U

Q

R

O

T

]

b

l-

t

f

[

m

N

]

5

2

.

8

1

[

4

6

4

0

0

2

4

3

9

J

]

5

3

1

[

5

.

2

8

1

]

1

2

[

3

3

5

0

0

3

4

3

9

J

]

5

3

1

[

5

.

2

8

1

]

4

2

[

0

1

6

0

0

4

4

3

9

J

]

5

3

1

[

5

.

2

8

1

Table 2 (Ventilated Discs)

DISC

1. Thoroughly inspect the tapered bore of the Disc Hub

and tapered surface of the Q.D. Bushing. Remove any

dirt, grease, or foreign material. Do not use lubricants

for this installation.

2. Assemble the Q.D. Bushing into the Disc Hub, aligning

the untapped holes in the Bushing Flange with the

tapped holes in the disc hub.

3. Insert the pull-up bolts and tighten to the recommended

torque (See Tables 1 and 2).

Note

Runout is minimized if a Dial Indicator is used as the

Pull-up Bolts are tightened. Place contact tip of the

Dial Indicator on the machined surface of the Rotor

to measure runout. Runout should be less than 0.38

mm [0.015 inches] (See Figure 1).

Two-port actuator shown.

CAUTION

If excessive tightening torque is applied, bursting

pressures are created in the hub. There must be

a gap between the flange of the Q.D. bushing

and the disc hub to ensure a proper press fit
of the Q.D. bushing onto the shaft.

This manual is related to the following products: