Fig. 5-4: main line with stub lines – Pilz PSS SB TESTER D User Manual
Page 29

Operating Manual: PSS SB TESTER
5-11
• Main line with stub lines
It is not possible to perform a length measurement on a main line with
stub lines. The stub lines have to be removed.
Fig. 5-4: Main line with stub lines
F2
F1
F3
HLP
ESC
VAL
ON
OFF
Remove
terminating resistor
Measured cable runs
Bus
subscribers
Remove
terminating resistor
Separate
stub line
This manual is related to the following products: