Assembly step 8 water bowl installation, Assembly step 9 handle installation, Assembly step 10 heat indicator installation – Weston Outdoor Propane Vertical Smokers User Manual
Page 10: Assembly step 11 nameplate installation, Assembly step 12 securing the hvr
ASSEMBLY STEP 8
WATER BOWL INSTALLATION
1. Slide the
Water Bowl into the lowest Rack position.
FIGURE 14
2. Insert the
Cooking Racks into the remaining Rack positions as desired; however,
do not insert a
Grid directly over the Water Bowl - the Water Bowl will restrict
heat distribution. For best results, the
Rack wires should run front to back.
3. Re-mount the
Door Panel by sliding the Door’s hinge pins into the Cabinet’s
hinge seats.
FIGURE 14
ASSEMBLY STEP 9
HANDLE INSTALLATION
1. Slide the washer onto the end of the
Door Handle, followed by the Spring.
FIGURE 15
2. Feed the
Door Handle into the hole through the front of the Door Panel.
FIGURE 16
3. From the back side of the
Door Panel, insert the Mounting Plate over the end
of the
Door Handle.
FIGURE 16
4. With
Lock Washers placed on the Bolts, insert the Bolts through the Mounting
Plate, into the pre-threaded mounts and firmly tighten the Bolts.
ASSEMBLY STEP 10
HEAT INDICATOR INSTALLATION
1. Remove the
Nut from the back of the Temperature Gauge and insert
the
Temperature Gauge into the Door Panel.
FIGURE 17
Make sure the
Temperature Gauge numbers are positioned right side up.
FIGURE 18
2. From the back side of the
Door Panel, place the Washer on, then
thread the
Nut onto the Temperature Gauge.
3. Tighten the
Nut firmly, but do not over tighten.
ASSEMBLY STEP 11
NAMEPLATE INSTALLATION
1. Insert the
Name Plate mounts through
the mounting holes in the front of the
Door Panel.
FIGURE 19
2. From the inside of the
Door Panel,
securely attach the
Push Nuts to the
Name Plate mounts.
ASSEMBLY STEP 12
SECURING THE HVR
1. Place one end of the
S-Hook around
the
HVR neck.
FIGURE 20
2. When an LP tank is not attached to the
Smoker, use the S-Hook to hang the
HVR from the Carry Handle on the
side of the
Smoker.
This will help
prevent dirt and other particles
from plugging the end of the
HVR.
ASSEMBLY IS NOW COMPLETE!
Please follow all instructions and
safeguards on the following pages for
connecting the LP tank.
-10-
-11-
LOCATE THESE PARTS
WATER
BOWL
COOKING
RACKS
30” MODEL HAS 3 RACKS
36” MODEL HAS 4 RACKS
48” MODEL HAS 6 RACKS
WATER
BOWL
COOKING
RACKS
CABINET
FIGURE 14
Door
D
HARDWARE & PARTS
TOOLS NEEDED
HARDWARE BAG
PHILLIPS
HEAD
SCREWDRIVER
DOOR
HANDLE
Includes Spring & Washer
2 WASHERS
2 MOUNTING
PLATE
2 BOLTS
30” / 36” MODELS HAVE 1 HANDLE
48” MODEL HAS 2 HANDLES
FIGURE 15
FIGURE 16
DOOR
PANEL
DOOR
HANDLE
Repeat steps 1-4 for the
48” Smoker, as it will
have 2
Handles to install.
E
HARDWARE
TOOLS NEEDED
HARDWARE BAG
1/2” WRENCH
TEMPERATURE
GAUGE
NUT
NOTE:
This Nut
is already threaded
onto the Temperature
Gauge and must be
removed for assembly.
WASHER
FIGURE 18
FIGURE 17
LOCATE THESE PARTS
FIGURE 19
NAMEPLATE
2 PUSH NUTS
FIGURE 20
F
LOCATE THESE PARTS
HARDWARE BAG
S-HOOK