Installation steps cont, Field converting console – WaterFurnace Envisio Series Console User Manual
Page 16
16
ENVISION CONSOLE - 50 HZ INSTALLATION MANUAL
Installation Steps cont.
1
Top view
Side view
Figure 3
2
Field Converting Console
Chassis is normally configured with controls on right end
and piping on left end (see Figure 3 top view). In this
position panel number 1 would be positioned against wall
or back plate. Unit may also be turned 180° against wall or
back plate. In this position controls will be on left end and
piping on right end panel number 2 would be positioned
against wall or back plate. Chassis must be enclosed with
an approved cabinet enclosure.
1. Remove 4 screws from front kick panel on cabinet.
2. Remove cabinet from chassis by lifting and sliding
cabinet straight up.
3. Remove grille assembly from cabinet by removing 4
screws from brackets located on the bottom of the grille
and door assemblies.
4. Replace grille/door assemblies into cabinet
repositioning pieces 1, 2, and 3 into the locations directly
opposite the original positions. Secure by replacing
mounting brackets. (Note: Be sure that louvers on the
grille assembly are facing the proper direction when
replacing the grille section.)
Figure 4
4
2
1
3
5
Depends on Cabinet Size
5. Replace grille/frame assembly into cabinet, and secure
by replacing mounting brackets.
6. Replace cabinet by sliding it down over the top of
the chassis.
7. Remove tab on leg that extends into return air opening.
When the grille side of the cabinet is flat against chassis
there will be 4 holes that line up in the leg section.
Only use 1 hole for alignment for opposite side of grille.
(NOTE: The tab can be removed by twisting back and
forth until it breaks off.)
8. Remove plastic strip from tab and replace on rough
edge that the tab was removed from.
9. Replace screws in font kick panel to secure cabinet
to chassis.
10. Mount filter bracket in designated opening area.
(NOTE: The filter bracket will only fit in one direction if
cabinet is installed properly.)