beautypg.com

Figure 13-b, Figure 13-e – Vortech 1993-1997 5.7L LT1 F-Body User Manual

Page 27

background image

P/N: 4GH020-010

©2003 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured

05NOV01 v1.2

C. Mount the coil and bracket assembly to the

upper supercharger mounting bracket. Use
the two 3/8-16 x 1-1/4" bolts previously
installed on the supercharger bracket to
mount the coil assembly.

D. Reinstall the upper radiator and coolant

hoses.

E. Mount the supplied ignition control box onto

the vehicle in the flat area behind the
headlight, next to the air pump. (See

Figure

13-b.

)

F.

Route the heavy black cable to a clean

ground. Extend the heavy red cable with the
supplied wire and connector. Route the red
cable to the (+) battery terminal.

G. Install the supplied wiring harness to the coil

and ignition box following

Figure 13-e

. Use

the supplied 1/4" male and female quick
disconnects.

H. Mount the timing control knob in an easily

accessible position from the drivers seat.
Attach the black wire to a clean ground and
the red wire to a keyed on 12V power source
or to the red wire from the Vortech ignition
box. Tape up the end of the yellow wire to
prevent contact with any metal surface.
Route the three wire harness to the supplied
map sensor and attach. Connect a manifold
sourced vacuum line to the map sensor
using a 5/32" TEE and hose.

I.

Use supplied cable ties to keep the harness

secure and away from moving objects.

15

AIR PUMP

IGNITION

CONTROL BOX

NOTE: If your kit is not equipped with MSD

harness #8876, proceed to
hardwire the ignition box following
the supplemental instruction sheet
included.

Figure: 13-b

13. COIL RELOCATION AND IGNITION BOX MOUNTING, cont'd.

FRONT OF

VEHICLE

TOP VIEW