beautypg.com

RAVE Sports Turbo Sled User Manual

Page 9

background image

8

Align valve with hole in the cover of the side rail.

Inflate bladder 50% full and check to ensure

bladder is not twisted and valve is properly

aligned with the hole in the cover. Adjust the

bladder if necessary.

Inflate side rails to firm but not hard. Inflating the product too firm

initially can make it difficult to join the sections together. Assemble

slide with sections partially full and top off inflation pressure in side

rail tubes once entire slide is set up.

A special inflation adaptor (included with the

High Speed Inflator) is needed for the Inflatable

Start Mat. Simply lock the adaptor onto the end

of the inflation hose and insert into the valve

body. Turn ¼ turn to lock in place.

NOTE: This inflation adaptor will automatically open the valve

when inserted and will close the valve when removed. You do

not need to manually open/close the valve when using this

special adaptor.

Inflate mat section so when kneeling on it with

one knee, it does not allow contact with the

ground. CAUTION: Do not fill until hard or the

mat will not provide proper cushioning.

To manually open valve,

depress the stem and rotate clockwise. To

close valve, depress the stem and rotate

counter-clockwise.

Note: It is normal for the air pressure within

the tube to fluctuate depending on air and water temperatures. It

may be necessary to increase or decrease the air pressure in your

product accordingly. To avoid damage on extremely hot days it may