Installation on a pole – MTI Wireless Edge MT-120018/V User Manual
Page 2
![background image](/manuals/739773/2/background.png)
INSTALLATION ON A POLE
Step 1
Connect the base bracket as shown on page 2.
Connect item 10 to item 1 (mate knurled
surfaces) using item 6,7,8,9 as shown.
Note: The bolt head shall be positioned in the
socket on item 1.
Use tightening torque of 24 N/m.
SHEET 2 OF 2
RD42233500C/A
1
10
7
8
9
6
ANTENNA OR RADIO
ENCLOSURE
Connect base bracket as shown on page 2
Connect item 5 to item 1 (mate the knurled
surfaces) using items 6,7,8,9 as shown.
Note: the bolt head shall be positioned in the
socket of item 1.
mount item 10 on the wall on the desired position.
(note the azimuth axis oriantation)
Attach item 5 to the arm bracket item 10 (mate the
knureld surfaces) using items 6,7,8,9 as
shown. Note the bolt head shall be positioned
in the socket of item 5.
Use tightening torque of 24 N/m to the azimuth
and elevation hardware.
MOUNTING ON A WALL
1
5
10
9
8
7
6
6
7
8
9
Wall mounting
holes ( Hardware
not supplied)
Elevation
axis
Azimuth
axis
STEP 2 (FOR POLES SIZES 1"-1.75")
Install the antenna to the pole using
item 11 as shown, tighten the bracket
using items 8,9,12.
Use tightening torque of 14N/m.
11
8
9
12
x2 x2 x2
11
8
9
STEP 2 (FOR POLES SIZES 1.75"-3")
Install the antenna to the pole using item 11,
tighten the bracket using items 8,9,12 (for
small pole diameter use item 6 instead of item 12).
Use tightening torque of 14N/m.
ANTENNA OR
RADIO ENCLOSURE
6 or 12
x2
x2
x2