Installation and operation, 1 delivery – Kipp&Zonen CFR Calibration Facility User Manual
Page 7

CFR manual
6
2
Installation and operation
2.1 Delivery
Check the contents of the shipment for completeness (see below) and note whether any damage has
occurred during transport. If there is damage, a claim should be filed with the carrier immediately. In this
case, or if the contents are incomplete, your dealer should be notified in order to facilitate the repair or
replacement of the product.
Contents of delivery:
•
Table (including voltage stabilization for 230 VAC / 50Hz version), turntable, shading mechanism
•
Lamp with power supply cable
•
One spare bulb
•
Lamp mounting pillar
•
High accuracy voltmeter
•
Accessories (stopwatch, cables, tools for installation)
•
Manual (2 copies)
•
Optional: reference pyranometer(s) with calibration certificate(s)
•
Optional: mountings for other Kipp & Zonen radiometers
•
Optional: mountings for pyranometers produced by other manufacturers.