beautypg.com

5 boiler installation – Glow-worm Micron 50FF User Manual

Page 16

background image

16

2000225227C

5 Boiler Installation

5.8 Pump Connection

The pump must be connected to the external controls.

5.9 Testing

Checks to ensure electrical safety must be carried out by a
competent person.

After installation of the system, preliminary electrical system
checks as below should be carried out:

Diagram 5.9

TOP

TURRET

6793

GASKET

SCREWS

(4)

TOP TURRET

FLUE OUTLET

FLUE

DUCT
EXTENSION

Diagram 5.8

MAINS
SUPPLY
230V~50Hz

BLOCK
CONNECTOR

bl

L

S

N

g/y

g/y

g/y

br

b

bl b

b

Diagram 5.10

SECURING

SCREW

12384

CONTROL

BOX

HINGE PIN

CABLE

CLAMP

GROMMET

Diagram 5.11

7333

TAIL PIPE

TUBING

NUT

AIR VENT

RETURN

FLOW

RUBBER

WASHER

1. Test insulation resistance to earth.

2. Test earth continuity and short circuit of all cables.

3. Test the polarity of the mains.

The installer is requested to advise and give guidance to the
user of the controls scheme used with the boiler.

Fit the casing.

WING NUT

AIR

DEFLECTOR

7665

TAPTITE

SCREWS

(2)

SELF-TAP

SCREWS (2)