Fm25 operator’s manual – Ditch Witch FM25 User Manual
Page 21
Controls - 20
FM25 Operator’s Manual
Power Unit
CMW
6.
Glow plug wait
indicator
Lights when intake air pre-
heater is operating.
Wait until light goes off before
starting engine.
7.
Glow plug button
To activate glow plugs, press.
IMPORTANT: Wait until glow plug
wait indicator goes off before starting
engine.
8.
Auxiliary outlet
To operate work lights or
other 12V devices, plug into
outlet.
Outlet has power only when ignition
switch is on.
9.
Throttle
To increase engine speed,
move up.
To decrease engine speed,
move down.
10. Pump 2 control
To turn on pump, press right
side of switch.
To turn off pump, press left
side of switch.
Item
Description
Notes
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)