Planning, Setting up at jobsite, Jt5 operator’s manual – Ditch Witch JT5 User Manual
Page 45

Operation Overview - 44
JT5 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 49.
2.
3.
Classify jobsite. See page 52.
4.
5.
Check supplies and prepare equipment. See page 61.
6.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 70.
3.
Assemble drill string. See page 79.
4.
Position drilling unit and frame. See page 75.
5.
Assemble strike system. See page 95.
6.
Anchor drilling unit. See page 93.
7.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
See also other documents in the category Ditch Witch Special machinery:
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)