beautypg.com

Top frame installation – Deltech Fitness DF4900LS- Linear Bearing Smith Machine with Stack Loaded Lat Attachment User Manual

Page 9

background image

TOP FRAME INSTALLATION

ATTACH THE TOP FRAME TO THE UPRIGHTS USING THE M12 x 92MM BOLTS (U), M12 WASHERS (W),
MOUNTING FLANGES (DD), CORNER FLANGES (CC), AND M12 LOCKNUTS (Y). REPEAT FOR
OPPOSITE SIDE.

MAKE SURE ALL THE BOLTS ARE TIGHT BEFORE USING. CHECK THEM PERIODICALLY TO
ENSURE THE BOLTS STAY TIGHT. HAVE A GOOD WORKOUT!

INSTALL THE TOP FRAME (H) ONTO THE UPRIGHTS AND GUIDE RODS.

U

W

DD

CC

W

Y

H