beautypg.com

Top frame assembly – Deltech Fitness DF4900LS- Linear Bearing Smith Machine with Stack Loaded Lat Attachment User Manual

Page 19

background image

INSTALL THE 3-1/2” PULLEYS (P) INTO THE TOP FRAME (A) USING THE
PULLEY BUSHINGS (V), THE M10 x 65MM BOLTS (Y), AND THE M10 LOCK
NUTS (II).

NOW INSERT THE 2” x 3” CAP (U) INTO THE END OF THE TOP FRAME (A).

U

A

I I

V

V

Y

P

TOP FRAME ASSEMBLY