beautypg.com

I i hh aa – Deltech Fitness DF4900LS- Linear Bearing Smith Machine with Stack Loaded Lat Attachment User Manual

Page 23

background image

UPPER PULLEY ASSEMBLY INSTALLATION

REMOVE THE M12 NUTS (CC), AND M12 WASHERS (BB) THAT HOLD THE UPPER PULLEY FRAME
ASSEMBLY TO THE BODY.

INSTALL THE UPPER PULLEY ASSEMBLY (D) TO THE LAT ATTACHMENT USING M10 x 75MM
BOLTS (X), M10 WASHERS (HH), AND M10 LOCKNUTS (II).

ATTACH THE UPPER PULLEY ASSEMBLY (E) TO THE CHROME RODS USING 3/8” x 1” BOLTS
(AA).

HH

D

X

I I

HH

AA