Setup steps, Setting up the work space, Table 5 – ADLINK RuffSystem 800 User Manual
Page 10: Preparations

RuffSystem Setup
6
User’s Guide
RuffSystem
Setup Steps
Follow the setup steps in this section in the order listed. Skip any steps that do not apply to your application.
References to other ADLINK manuals are provided in this section for more information about installation
and use of this RuffSystem.
Setting Up the Work Space
Table 5. Preparations
1) Open shipping box.
•
Locate the RuffSystem Contents List.
•
Unpack the contents of the shipping box.
2) Verify contents.
•
Verify the contents of the shipping box against the Contents List included
with your RuffSystem.
•
If anything is missing or damaged, call your sales representative. Refer to
the Ampro By ADLINK web page at
http://www.adlinktech.com
for con-
tact information.
3) Obtain support
documentation.
LittleBoard 735 Reference Manual
This document provides detailed information on the LittleBoard 735 and is
located on the Ampro By ADLINK web page at
http://www.adlinktech.com
.
LittleBoard 800 Reference Manual
This document provides detailed information on the LittleBoard 800 and is
located on the Ampro By ADLINK web page at
http://www.adlinktech.com
COM 840 Reference Manual
This document provides detailed information on the COM 840 and is located
on the Ampro By ADLINK web page at
http://www.adlinktech.com
.
NOTE
To prevent damage to the RuffSystem, ensure sufficient clearance exists around
the cooling fins for unrestricted airflow. See
.
4) Select workbench
location.
•
The workbench location should be a flat clean surface for setup and opera-
tion (including the connection of any external peripherals and optional
devices).
•
Ensure sufficient airflow clearance exists around the complete enclosure.
5) Unpack RuffSystem.
•
Remove the RuffSystem from its shipping container and place it on a flat
work surface.
•
The RuffSystem enclosure combined with LittleBoard or COM module, a
storage device (HDD, CF, or SSD), and the optional OS form a complete
system, ready for operation.