beautypg.com

Assembly instructions, Unpacking, Parts in carton – MTD 24650-9 User Manual

Page 4: Contents of hardware pack (see figure 1), Chute deflector installation

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

NOTE

This

unit

is

shipped

WITHOUT

GASOLINE

or

OIL.

After

assembly,

see

separate

engine

manual

for

proper

fuel

and

engine

oil recommendations.

ASSEMBLY INSTRUCTIONS

Tools Required for Assembly:

(2)

7/16" Open End or Box Wrenches*

(1)

1/2" Socket Wrench

* An Adjustable Wrench may be used in place of one

of the wrenches.

NOTE

The right and left side of your shredder

is determined from behind the unit.

UNPACKING

Remove

the

shredder

and

loose

parts

from

the

carton.

Make

certain

ail

parts

and

literature

have

been

removed before the carton is discarded.

Parts in Carton:

Shredder

Chute Deflector

Hopper

Upper Leaf Ramp Section

Catcher Bag

Hardware Pack

Contents of Hardware Pack (See Figure 1):

Hex Bolts 1/4-20 x 1/2" Long

Hex Lock Nuts 1/4-20 Thread

Hex Washer Head Self-Tapping Screws

5/16-18 X 3/4" Long

Keepers

Safety Glasses (Not Shown)

A

(8)

B

(8)

C

(6)

D

(2)

(1) :

FIGURE 1.

CHUTE DEFLECTOR INSTALLATION

1.

Place

the

chute

deflector

in

position

on

the

discharge opening (on the left side of the shred-

------ der). See figure 2.

2.

Secure

chute

deflector

to

discharge

opening

with

hex bolts (A) and hex lock nuts (B). Heads of the

hex bolts are inside the discharge opening. Hex nuts

go on the outside.

3.

Tighten all four nuts and bolts securely.