No hardware required, Lower chute (see fig. 8 & 9), Use hardware - - group "d – Sears 917.249491 User Manual
Page 9: Assembly
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

ASSEMBLY
6
CONTAINER MOUNTING
(See Fig. 7)
No hardware required
« Install one container to left side first with warning to
outside of unit, install other container to right side.
NOTE: Right container should always overlap left con'
tainerat center support.
* Close cover and lock latch handle over center support
tube.
7
LOWER CHUTE (See Fig. 8 & 9)
Use Hardware - - GROUP "D"
Install two latch hook assemblies, to lower chute using
screw, washer, lock washer, and weld nut as shown
Tighten hardware securely.
Raise and hold deflector shield in upright position.
Place front of chute over front of mower deck opening
and slide into place, as shown.
Hook front latch into tab hole on front of mower deck.
Hook rear latch into tab hole on back of mower deck.
If your tractor is equipped with gage wheels on the
deck, then it wili be necessary to use the hole in the
R.H, gage wheel mounting bracket.
CAUTION: Do not remove discharge guard
from mower. Raise and hold guard when
attaching lower chute and allow it to rest
on chute while in operation.
LOCK WASHER
WASHER
WITH OUT
GAGE
WHEELS
Fig. 8
0
LATCH ^WELD
NUT
V ,
DEFLECTOR
. J|/SHtELD
...tap
WITH
GAGE
WHEELS
FRONT
LATCH
REAR LATCH
ÏI DEFLECTOR
4 SHIELD
0
:\Ê
' r
( '■
GAGE
WHEEL
(fj\\ FRONT
BRACKET
\ LATCH
REAR LATCH
Fig. 9b