Allow sufficient cooling of the pump before
starting maintenance.
+
Vent the pump and isolate it from the
vacuum system before you start mainte-
nance. Drain condensate, if applicable.
Ensure that maintenance is done only by suitably
trained and supervised technicians.
The valves and diaphragms are wear parts. If the rated
ultimate vacuum is no longer achieved or in case of in-
creased noise level, the pump interior, the diaphragms
and the valves must be cleaned and the diaphragms and
valves must be checked for cracks or other damage.
All bearings are encapsulated and are filled with long-life
lubricant. Under normal operating conditions, the drive
system is maintenance free.
In demanding circumstances, it may be efficient to check
and clean the pump heads on a regular basis. In normal
use, the lifetime of the diaphragms and valves is typically
15,000 operating hours.
- Prevent internal condensation, transfer of liquids or
dust. The diaphragms and valves will be damaged if
liquid is pumped in significant amount.
- Carry out maintenance frequently if the pump is ex-
posed to corrosive media or in case of deposits.
- Regular maintenance will improve the lifetime of the
pump and also protect both users and the environment.
NOTICE
atm
°C / °F
Set of seals (diaphragms, valves and O-rings).........................................2x 696867
for
ME 16C NT VARIO / PC 3016 NT VARIO
Set of seals (diaphragms, valves and O-rings) ............................................696839
for
MD 12C NT VARIO, MV 10C NT VARIO / PC 3012 NT VARIO / PC 3010 NT VARIO
Diaphragm key (w/f 66) ...............................................................................636554
+
Service only one side of the pump at a time to avoid the mixing of
parts.
+
In case, support the pump appropriately.