Toa CR-413-6 User Manual
Page 18

18
5.3. Securing to a Wall
A ø6.5 mm (0.26”) knockout hole is provided in the top cover of the rack. (See page 5.)
Remove the knockout with a screwdriver, and secure the top cover to a wall using a bracket (separately
prepared).
[Example]
5.4. Securing Multiple Racks in Line
Two ø12 mm (0.47”) knockout holes are provided in each side cover. (See page 5.) When installing multiple
racks in line, remove these knockout holes with a screwdriver, then connect each adjacent racks using M8
bolts and nuts.
Bolt *
M6 bolt *
Bracket *
Anchor *
Knockout hole (ø6.5 mm or 0.26”)
Plain washer for M6 *
Nut for M6 *
CR-413-6’s top cover
* Prepare separately.
See also other documents in the category Toa Equipment:
- D-2000 Series Installation (84 pages)
- DD-2000 Series Manual (24 pages)
- D-2000 Series Read Me First (12 pages)
- D-2012AS (2 pages)
- D-2012C (4 pages)
- D-901 (96 pages)
- CR-273 (20 pages)
- EV-20R (20 pages)
- MP-1216 (8 pages)
- MB-WT3 (2 pages)
- MT-251H (1 page)
- F-2322C (12 pages)
- F-2852C (12 pages)
- SC-630 (2 pages)
- ES-0851 (4 pages)
- ES-C0651 (4 pages)
- F-1000B (18 pages)
- F-122C (12 pages)
- F-122CU (20 pages)
- F-122CU2 (16 pages)
- F-1300B (18 pages)
- F-1522SC (8 pages)
- AN-9001 (1 page)
- C-AL80 (16 pages)
- DP-K1 (102 pages)
- DP-K1 (28 pages)
- DP-L2 v.2.00 (28 pages)
- DP-SP3 Protocol (14 pages)
- DP-SP3 (24 pages)
- DP-SP3 (75 pages)
- E-232 (8 pages)
- AT-063AP (4 pages)
- BS-1015BSB (8 pages)
- BS-1030B (4 pages)
- BS-634 (4 pages)
- BS-1034EN (8 pages)
- BS-1110W (4 pages)
- BS-301B (8 pages)
- BS-301B AS (4 pages)
- MB-WT1 (1 page)
- S-D7300 (16 pages)
- VX-200SP-2 (24 pages)
- YA-1000A (1 page)
- ZM-9001 (2 pages)