5. Securing Canister Top to Canister Base.
A. Make sure all surfaces are free from dust and other particulate.
B. Hemisphere O-ring must rest evenly along canister base O-ring groove,
see figure C.5.1.
C. Secure V-band by disconnecting hex nut or T-bolt portion and placing V-
band along the diameter of canister O-ring groove. Fasten nut or T-
handle and secure tightly. V-BAND LEGS MUST REST UNIFORMLY
ALONG ENTIRE O-RING GROOVE! See figures C.5.2 and C.5.3.
Figure C.5.1: Correct placement of O-ring in O-ring groove.
Figure C.5.2: Correct placement of V-Band.
Figure C.5.3: Detailed V-Band placement along O-ring groove.