beautypg.com

Solberg SRS Series User Manual

Page 12

background image



Solberg Manufacturing, Inc., 1151 Ardmore Itasca, IL 60143 USA

Ph: 630.773.1363 Fax: 630.773.0727 Email: [email protected] Web: www.solbergmfg.com

Page 12

5. Securing Canister Top to Canister Base.

A. Make sure all surfaces are free from dust and other particulate.

B. Hemisphere O-ring must rest evenly along canister base O-ring groove,

see figure C.5.1.

C. Secure V-band by disconnecting hex nut or T-bolt portion and placing V-

band along the diameter of canister O-ring groove. Fasten nut or T-
handle and secure tightly. V-BAND LEGS MUST REST UNIFORMLY
ALONG ENTIRE O-RING GROOVE! See figures C.5.2 and C.5.3.



Figure C.5.1: Correct placement of O-ring in O-ring groove.

Figure C.5.2: Correct placement of V-Band.

Figure C.5.3: Detailed V-Band placement along O-ring groove.

This manual is related to the following products: