Warning – Solberg SMConfigurationB(Pg.3-10,11) User Manual
Page 14
Solberg Manufacturing, Inc., 1151 Ardmore Itasca, IL 60143 USA
Ph: 630.773.1363 Fax: 630.773.0727 Email: [email protected] Web: www.solbergmfg.com
Page 14
7. Securing canister top to canister base.
A. Make sure all surfaces are free from dust and other particulate.
B. Hemisphere O-ring must rest evenly along canister base O-ring groove, as
shown in figure C.6.1.
C. Replace cover. Secure wireform clips as shown in figure C.7.1.
8. Equipment Startup.
A. Be sure to read the instructions on installation or element replacement as
listed above before starting equipment.
*WARNING*
If at any time the operator is unable to
verify the integrity of the element or any
housing feature, the factory or a regional
representative should be contacted prior to
start-up.
B. Please check the listed steps prior to startup.
1. Check element to make sure it is seated properly on element
base or sealing surface.
Figure C.7.1: Housing top and clip in secured position.