Step 2 – Slant/Fin EC-20 Assembly Instructions User Manual
Page 4

Step 2
Mounting: Hinged door
4
EUTECTIC EC-20 ASSEMBLY GUIDE
Step 2
Boiler casting assembly is normally shipped with boiler door hinges on the right when viewing boiler from front.
If boiler casting assembly has door removed, it can be mounted with hinges on the right side when viewing from the front
by following the procedure below..
1.
Put the lower hinge in place against the front section
2.
Secure the lower hinge: 1 screw HM 10x50 + CL 10-20 wide conical washer.
3.
To be prefitted to the front section, in the upper hinge position: 1 screw HM 10x50 + CL 10-20 wide conical washer.
4.
Hang on the boiler door
5.
Put the upper hinge in place and tighten the screw.
6.
Fit the H10x20 adjustment screw to the upper hinge.
If you want to mount boiler door with hinges on the left when viewing from the front, then follow the above directions, in
much the same way.
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- CHS-85 (36 pages)
- CHS-FS-40 (6 pages)
- EC-20 Installation (16 pages)
- EC-10 Installation (24 pages)
- EC-10 Assembly Instructions (12 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EH-M3 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- TRDV Series Venting (16 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)