beautypg.com

Step 1– mounting feet – Slant/Fin EC-20 Assembly Instructions User Manual

Page 3

background image

Step 1– Mounting Feet

3

EUTECTIC EC-20 ASSEMBLY GUIDE

1.

Fit the adjustable feet to the height converter (The feet are delivered with the screw bag in the jacket and insulation package)

.

1

Tools required:

• 1 Phillips screwdriver

• 1 Wide flat screwdriver

• 1 13mm open end wrench

• 1 17mm open end wrench

• 1 19mm open end wrench

Boiler body assembly