Shellab SSI3-2 User Manual
Page 2

2
TABLE OF CONTENTS
SECTION 1.0
RECEIVING AND INSPECTION
SECTION 2.0
GRAPHIC SYMBOLS
SECTION 3.0
INSTALLATION
SECTION 4.0
CONTROL OVERVIEW
SECTION 5.0
OPERATION
SECTION 6.0
MAINTENANCE
SECTION 7.0
TROUBLESHOOTING
SECTION 8.0
PARTS LIST
SECTION 9.0
SPECIFICATIONS
WIRE DIAGRAM
These units are TUV CUE listed as orbital shaking incubators for
professional, industrial, or educational use where the preparation
or testing of materials is done at approximately atmospheric
pressure and no flammable, volatile, or combustible materials are
being heated.
These units have been tested to the following requirements:
CAN/CSA C22.2 No. 61010-1:2012
CAN/CSA C22.2 No. 61010-2-010 + R:2009
UL 61010-1:2004 + R:2005-07 + R:2008-10
UL 61010A-2-010:2002
UL 61010-1:2012
EN 61010-1:2010
EN 61010-2-010:2003
IEC 61010-1:2010
IEC 61010-2-010:2003