beautypg.com

Installation instructions (continued) – Perfect Aire PAC5000 User Manual

Page 9

background image

8

INSTALLATION INSTRUCTIONS (CONTINUED)

PREPARE THE WINDOW

1

3/4 (or 1/2 )

Screws

(7)

Lock Frame

(2)

Sash Lock

(1)

Mounting Hardware

Window sash

seal foam

(1)

PREPARE AIR CONDITIONER

2

C: Align the hole in the top rail with those in the

top of the unit as shown in Fig.B

D: Secure the top rail to the unit with the 3/8"

screws as shown in Fig.C.

NOTE: For safety reasons, all four(4) screws

MUST be securely fastened.

INSTALL THE ACCORDION PANELS

3

NOTE: Top rail and sliding panels at each side

are offset to provide the proper pitch to the rear

of (5/16"). This is necessary for proper

condensed water utilization and drainage. If you

are not using the side panels for any reason, this

pitch to the rear must be maintained.

A.Place unit on floor, a bench

or a table. Hold the

accordion panel in one

hand and gently pull back

the center to fill the

open end. See Fig.1.

Fig.1

Lower sash must open sufficiently to allow a clear

vertical opening of 13 inches (330 mm). Side

louvers and the rear of the AC must have clear air

space to allow enough airflow through the

condenser, for heat removal. The rear of the unit

must be outdoors, not inside a building or garage.

A: Remove the air conditioner from the carton and

place on a flat surface.

B:

Remove top rail from the rear of the packaging

material as shown in Fig. A.

Packaging

Fig. A

Top Rail

Fig.B

Fig.C

Top Rail Hardware

3/8" Screws

(4)

Top Rail

(1)

or

or