beautypg.com

5 roll cylinder installation – NORAC UC5-BC-KS01 User Manual

Page 30

background image



27

9.5 Roll Cylinder Installation

1. Remove the link arm (black square tube) connected between the parallel lift frame and roll

frame. See Figure 30 for the link arm location.

Figure 30: John Deere Link Arm Location (looking towards rear of sprayer)

2. Remove the lower link bolt and nut.

3. Roll the intermediate frame (where the link is still attached) counterclockwise until the

upper link pin can be accessed. It may be helpful to use a jack or strap between the boom
frame and the intermediate frame. Remove the snap-ring from the link pin. Remove the
pin and link.

4. Install the cylinder (H75) into the lower mount so that the cylinder ports face the front of

the sprayer. Ensure the pivot sleeve is installed into the cylinder. Install the bolt through
the cylinder and sleeve and torque to 250 ft-lbs (339 Nm).

Figure 31: Lower Bolt Installation

Link Arm

Position