7 Position Sensor Installation

The position sensor (E06) should be mounted such that the largest amount of travel of the
sensor can be utilized without exceeding the travel limit. The sensor install length is 17”
(430mm) center to center with ±3.5” (±90mm) travel recommended. It should be mounted in
a location where the sensor will mount without binding or contacting and that is perpendicular
to the direction of travel. Roll the boom fully in each direction and take measurements to
ensure the travel limit is not exceeded.

1. Measure 12-3/4” (325mm) from the centerline of the intermediate frame and boom center

frame towards the left side of the sprayer (when looking from the rear of the sprayer).

Figure 11: Measurement from Centerline of Intermediate Frame (Looking from the Rear)

2. Mount the brackets (B09) as shown in Figure 12, Figure 13 and Figure 14. Install two

(2) cable ties per bracket.

Figure 12: Bottom Bracket Mounting

Figure 13: Top Bracket Mounting

12-3/4”

(325mm)