beautypg.com

3 hydraulic plumbing – NORAC UC5-BC-RG13 User Manual

Page 26

background image



24

9.3 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. Install the 8FORX 8MOR45 (F04) fitting onto fitting F03 on the “T” port of the NORAC

block.

3. Disconnect the tank line at the Rogator valve block and insert the 8FORXR 8MORT tee

(F05).

4. Connect the 45 degree end of hose H02 to the tee (F05) and route to the NORAC valve

block. Connect the straight end of hose H02 to F04 on the “T” port.

5. Disconnect the pressure line at the Rogator valve block and insert the 6FORXR 6MORT

tee (F02).

6. Connect the 45 degree end of hose H01 to the tee and route to the NORAC valve block.

Connect the straight end of hose H01 to F01 on the “P” port.

Figure 29: Pressure and Tank Plumbing at NORAC Valve Block

Figure 30: Pressure and Tank Plumbing at Rogator Valve Block

F03

F01

F04

H02

F05

F02

H01

H02

H01