3 hydraulic plumbing – NORAC UC5-BC-RG13 User Manual
Page 26
24
9.3 Hydraulic Plumbing
From this point on in the installation the booms will be inoperative until the
hydraulics are fully installed.
1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The
plumbing for the hydraulic circuit is shown schematically in Figure 3.
2. Install the 8FORX 8MOR45 (F04) fitting onto fitting F03 on the “T” port of the NORAC
block.
3. Disconnect the tank line at the Rogator valve block and insert the 8FORXR 8MORT tee
(F05).
4. Connect the 45 degree end of hose H02 to the tee (F05) and route to the NORAC valve
block. Connect the straight end of hose H02 to F04 on the “T” port.
5. Disconnect the pressure line at the Rogator valve block and insert the 6FORXR 6MORT
tee (F02).
6. Connect the 45 degree end of hose H01 to the tee and route to the NORAC valve block.
Connect the straight end of hose H01 to F01 on the “P” port.
Figure 29: Pressure and Tank Plumbing at NORAC Valve Block
Figure 30: Pressure and Tank Plumbing at Rogator Valve Block
F03
F01
F04
H02
F05
F02
H01
H02
H01