3 input module – NORAC UC5-BC-JD08A User Manual
Page 26
23
8.3 Input Module
1. Install the input module (E03) on the boom near the sprayer valve block. Secure it to the
boom using cable ties or optional brackets.
2. Connect the free end of the CANbus cable (C02) from the valve module to the input
module. Connect cable C03 to the other CANbus connector and route to the 8-way
coupler.
3. Insert the 12 pin plug (P02) into the OEM 3 connector on the end of the input module.
Figure 24: Input Module Connections
4. Connect the 12 pin connector on the tilt interface cable (C20) to the Thru 2 connector on
the side of the input module. Insert the other connectors on C20 into the tilt connectors
on the John Deere solenoids.
5. Connect the 12 pin connector on the main lift interface cable (C21) to the Thru 1
connector on the side of the input module. Insert the other connectors on C21 into the
main lift connectors on the John Deere solenoids.
6. Route the long cable (with Deutsch connectors) on C21 under the sprayer. Connect the
tee connectors into the jam valve connector, located at the JD shuttle valve, under the
sprayer (Figure 25).