beautypg.com

2 valve assembly: double acting – NORAC UC5-BC-GN01 User Manual

Page 31

background image



28

10.2 Valve Assembly: Double Acting

1. On a clean surface remove the plastic plugs from the block.

2. Install the 6MB-6MJ (F07) fittings into the “P” and “T” ports. Tighten to 18 ft-lbs (24 Nm).

3. Insert the two orifices (F08) into the “B” ports with the notch facing out.

4. Install the 6MB-6MJ (F07) fittings into the “B” ports. Tighten to 18 ft-lbs (24 Nm).

5. Insert the two orifices (F08) into the “A” ports with the notch facing in.

6. Install the 6MB-6MJ (F07) fittings into the “A” ports. Tighten to 18 ft-lbs (24 Nm).

Fitting F07 is a special fitting; if an additional coupler is required, contact NORAC.

Figure 31: NORAC Valve Block Details (Double Acting)