beautypg.com

6 completing the installation, 7 boom lockout positioning – NORAC UC4+BC+HG4 User Manual

Page 20

background image

17

4.6 C

OMPLETING THE

I

NSTALLATION

1. Start up the sprayer and test the

sprayer’s functionality. The NORAC
Control Panel does not need to be
powered up for the original switches to
function. Unfold the booms and
raise/lower each boom and main
section.

Again confirm that the

cabling/hoses are agreeable to
the entire range of motion.

2. Turn on the power for the UC4+

Control Panel using the switch on the
side of its chassis.

3. The procedure for the installation of the

UC4+ Spray Height Control system is
now complete. Begin the AUTOMATIC
SYSTEM SETUP procedure as described

in the UC4+ Spray Height Control
Operator’s Manual
(M01).

4.7 B

OOM

L

OCKOUT

P

OSITIONING

The Hagie boom is equipped with boom
lockouts, located on both sides of the
center boom section. These lockouts must
be correctly positioned for proper
operation and to prevent component
damage.

Truck Transport - When transporting on

a truck the boom lockouts should be fully
engaged to prevent the center section from
rolling over.

Folding – If the oil is hot it may be
necessary to place the lockouts in the
locked position to prevent the boom from
rolling. During normal folding this should
not be necessary.

Field Operation – When operating the
sprayer in the field the lockouts should
ALWAYS be fully retracted to allow the
boom to roll.

The booms functions should

never be operated when the
lockouts are engaged, other than
for folding and unfolding.