beautypg.com

3 hydraulic plumbing – NORAC UC4+BC+HG4 User Manual

Page 18

background image

15

4.4.3 Hydraulic Plumbing

WARNING!

From this point in the installation the
booms will be inoperative until the
electronics are fully installed.

1. After the NORAC valves are mounted,

the hydraulic hoses and fittings can be
plumbed. The plumbing for the hydraulic
circuit is shown schematically in Figure
3
.

The “B” lines of the NORAC

valve block must be connected to
the Hagie “raise” lines.

Ensure there are no other

orifices present between the
NORAC valve block and the
boom cylinders.