beautypg.com

5 electrical installation – NORAC UC4+BC+HG4 User Manual

Page 19

background image

16

4.5 E

LECTRICAL

I

NSTALLATION

1. Install the UC4+ Control Panel (E01) in

the cab of the sprayer. Mount the panel
where it will be clearly visible and within
easy reach of the operator.

In the Hagie cab, a good spot to

mount the UC4+ control panel is
on the right hand side of the cab,
next to the spray controller

Figure 19: Control Panel Mounting

If mounting the panel to a round

pole, use the rail mount adapter
kit (B06) (Figure 20).

Figure 20: Mounting the Control

Panel Using the Adapter Kit (B06)

2. Cable C05 can be teed in between the

sensor on the linear roll cylinder and
the wiring harness.

3. Route the other end of C05 to the main

lift sensor.

4. Cable-tie installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.