8 completing the installation – NORAC UC4+BC+TA1 User Manual

Page 29

background image

26

4.8 C

OMPLETING THE

I

NSTALLATION

1. Start up your sprayer and test the sprayer’s

functionality. The NORAC Control Panel
does not need to be powered up for the
original switches to function. Unfold the
booms and raise/lower each boom and main
section.

Confirm that the cabling and hoses

work for the entire range of motion.

2. If any functions do not work, review the

hydraulic and electrical portions of this
manual to check for proper installation.

3. Turn on the power for the UC4+ Control

Panel using the switch on the side of its
chassis.

4. Repeat the Boom Speed Test as described in

Section 4.2 with the UC4+ System installed.
Record the results for comparison in Table

5.

5. For optimal performance, there should be

very little play at the hitch clevis. The
addition of polymer washers can help tighten
up this connection (Figure 31).

Figure 31: Hitch Point

6. The procedure for the installation of the

UC4+ System is now complete. Begin the
AUTOMATIC SYSTEM SETUP procedure as
described in the UC4+ Sprayer Boom
Control Operator’s Manual
(M01).