beautypg.com

NORAC UC4+BC+SC4 User Manual

Page 22

background image

19

Figure 23: Cable Configurations: C10, C02 and C03

9. Connect the 6-pin Tower on the Valve

Cable (C03) to the mating 6-pin Shroud on
C10 at the rear of the sprayer and route to
the NORAC valve block (Figure 23).

19.

The connectors on the valve cable (C03)
are marked RIGHT UP, LEFT UP,
RIGHT DOWN and LEFT DOWN.

Cables labeled with UP go on the same side
as the hydraulic hoses.

Figure 24: Valve Cable Connections

20. Connect the sensor branch cable (C02) to

the 4-pin AMP plug on C10.

21. Route the long branches of the sensor

branch cable (C02) to the wing sensors and
connect. Follow existing cables and/or
hydraulic lines along the boom.

22. Route the short branch of cable C02 to the

roll sensor and connect.

23. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the main
section, parallel lift, and FOLDING boom
movement.