NORAC UC4+BC+SC2 User Manual
Page 27
24
Figure 29: Cable Configurations: C01, C02, C02B, C03 and C04
18. Connect the 6-pin Tower on the Valve
Cable (C03) to the mating 6-pin Shroud on
C04 at the rear of the sprayer and route to
where the NORAC valve is located (Figure
29).
19. The connectors on the valve cable (C03)
are marked RIGHT UP, LEFT UP,
RIGHT DOWN and LEFT DOWN.
Cables labeled with UP go on the same side
as the hydraulic hoses.
Figure 30: Valve Cable Connections
20. Connect the CAN Node cable (C02B) to
the 4-pin AMP plug on C01 (Figure 29).
21. Route the CAN Node cable (C02B) to the
roll sensors. Follow existing cables and/or
hydraulic lines.
22. Connect 4-pin AMP connectors on C02B to
the roll sensors.
23. Connect the sensor branch cable (C02) to
the 4-pin AMP plug on C02B.
24. Route the sensor branch cable (C02) to the
wing and main sensors and connect to the
sensors. Follow existing cables and/or
hydraulic lines along the boom.
25. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the main
section, parallel lift, and FOLDING boom
movement.