3.1

Target Modification and Alignment (Active Roll™ Only)

It is very important that the rods be installed on the right hand side of the sprayer.
If the brackets are installed on the left hand side, they must be moved.

1.

Ensure the sprayer chassis and booms are leveled and the center section is approximately 4

feet above the ground. A ladder or step will be required for this part of the installation.

Figure 8: Roll Control™ Items

Figure 9: Typical Roll Control™ Install

Frame Target

(B07)

Spring Target

(B08)

Sensor Bracket

(B11)

Remove the

Rubber Bumper

Frame

Target

Roll
Control

Frame

Sprayer Parallel Lift Frame

Sensor

Bracket

Roll

Sensor

Spring

Target

Boom Centre
Frame