NORAC UC4+BC+JD7 User Manual
Page 32
30
12. Install the 2-pin connectors from C03
onto each NORAC valve as shown in
Figure 35.
13. The connectors on the valve cable
(C03) are marked RIGHT UP, LEFT
UP, RIGHT DOWN and LEFT
DOWN. Cables labeled with UP go
on the same side as the hydraulic hoses.
Figure 35: Valve Cable Connections
14. Connect the CAN Node cable (C02B)
to the 4-pin AMP plug on C01
15. Route C02B to the roll sensors which
are installed in Section 4.5. Follow
existing cables and/or hydraulic lines.
16. Connect the sensor branch cable (C02)
to the 4-pin AMP plug on C02B
(Figure 36).
17. Route C02 to the wing and main
sensors and connect to the sensors.
Follow existing cables and/or hydraulic
lines along the boom.
Route the main lift cable through
the main lift mounting bracket
tube to provide additional cable
protection
18. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.
Figure 36: Cable Configurations: C01,
C02 and C02B